top of page

Based in Mesa, Arizona, Safeline Aviation provides Tailwheel and Spin Endorsement Training, with an optional Upset Prevention and Recovery Training (UPRT) add-on. Training is conducted by a lifelong professional aviator with over 25 years of experience as a CFII, MEII, and ATP.

 

Tailwheel endorsements typically require two to four days of training. Total flight time varies by pilot experience and proficiency.

Tailwheel Endorsement Training - $1,500

Includes up to 5 hours of tailwheel flight time and 2 hours of ground instruction, typically conducted over two days.

  • Additional flight time: $249/hour (wet, with instructor)

  • Additional ground instruction: $85/hour

 

Spin Endorsement Training $450

Includes 1 hour of ground instruction and 1 hour of flight training.

Optional Add-On:

Upset Prevention and Recovery Training (UPRT): +$300

Adds 1 additional hour of ground instruction and 1 additional hour of flight training

​​

Safeline Aviation conducts all Tailwheel, Spin, and UPRT training in a 1999 Citabria GCBC Explorer.

  • Facebook
Training Base - Mesa, AZ KFFZ
Owner Svs Base - Henderson, NV
Recovery Svs Base - N. Las Vegas, NV

Safeline Aviation conducts flight operations exclusively under 14 CFR Part 91. All aircraft movements are owner- or insurer-authorized and do not constitute common carriage or commercial air transportation. All maintenance services are performed under 14 CFR Part 43 on an owner-authorized basis. Aircraft movement, if required, is coordinated separately and conducted under 14 CFR Part 91.

© 2026 All Rights Reserved - Safeline Aviation and Affiliates

bottom of page